Fallstudien

  • Home
  • Case Studies Grid Originale
All Fallstudien Messgeräte für geotechnik Messgeräte für TALSPERREN Real Time and Wireless monitoring Solution Strukturüberwachung (SHM)

Gottard road tunnel – 2nd tube

Installation of a measuring system to monitor the excavation pit at the start of the tunnel Gottardo tunnel

Waste water treatment plant Zimmerberg and monitoring of retaining wall

Installation of a measuring system to monitor the WWTP in Zimmerberg and monitoring of retaining wall

Kleinmatterhorns, Zermatt – Rock cliff monitoring

Installation of a measuring system to monitor the Kleinmatterhorns Rock cliff

Sardar Sarovar Dam Rehabilitation Project

Rehabilitation of the dam and transition from manual to automatic monitoring.

Piz Nair St. Moritz – Foundation summit station

Installation of a measuring system to monitor the foundation of the the Piz Nair cableway mountain station.
Load More